Panel Unit with Scissors Structure, Telescopic Panel, and Panel-Type Scissors Bridge
This technology introduces a modular, expandable scissors-structure panel system for rapidly constructing medium-scale temporary bridges. It combines high …
2× Faster Temporary Bridge Deployment, ~70% Labor Cut
~$100K/year estimated site cost reduction per facility (est.)
Drainage Construction Support System
This technology automates initial planning for drainage construction by efficiently guiding soil surveys and map creation. It determines optimal survey poi…
Automated Drainage Planning: Cut Project Lead Time by ~20%
~$200K/year estimated cost reduction per facility (est.)
Seismic Reinforcement and Isolation Method for Traditional Timber Structures
This technology offers a unique seismic reinforcement and isolation method for traditional timber structures on soft ground. It enables foundation upgrades…
Seismic Upgrade for Historic Sites: Cut Renovation Downtime by 20%
~$15K/year estimated cost reduction per facility (est.)
System for Reducing Vehicle Theft Risk in Smart Entry Vehicles
This system enhances existing smart entry vehicles with advanced, retrofit biometric security. It prevents relay attacks by linking smart operations (unloc…
Cuts vehicle theft by 90% with retrofit biometric security
~$1.5M/year estimated damage avoidance per facility (est.)
Method for Repairing Ballast Tracks, Repair Material, and Ballast Track
This technology offers an innovative method for repairing railway ballast tracks, utilizing a rapid-hardening cement and polymer flocculant mixture. By dir…
2x Track Lifespan, ~60% Faster Repair for Railway Ballast
~$1.0M/year estimated maintenance cost reduction per facility (est.)
Method for Repairing Flooring
This technology enables direct, subfloor-free repair of sunken flooring using a specialized height adjuster and threaded rod. It eliminates subfloor access…
Subfloor-Free Floor Repair: Cuts Annual Costs by ~$330K per Facility
~$350K/year estimated repair cost reduction per facility (est.)
Mobile Device, Remote Control Device, System, and Program
This system automatically records vehicle parking locations, triggered by a remote door lock signal. It eliminates manual recording and the frustration of …
Auto-Record Parking: Cut Search Time by 100%, Boost CX
~$1.0M/year estimated customer search time and operational cost reduction per facility (est.)
In-Vehicle Device, Unlocking System, System, and Method for Controlling an In-Vehicle De…
This technology enables secure, in-car package delivery to a recipient-specified location, eliminating redelivery issues and enhancing customer convenience…
Zero Redeliveries, ~20% Delivery Efficiency Boost with In-Car Drop-Off
~$1B/year estimated redelivery cost reduction annually (est.)
Sliding Door and Operating Mechanism Structure
This technology introduces a novel sliding door mechanism that applies force directly to the door's center, reducing opening/closing effort by ~30%. It ena…
Center-Pull Door Design: 30% Less Force, Slimmer Profiles
~$75K/year estimated cost savings per facility (est.)
Fastener
This innovative fastener system uses a unique pin and nut design to achieve a secure lock in less than one full rotation. Its mechanism involves projection…
Sub-Rotation Fastening: Boosts Assembly Speed by 33%, Confirms Lock Audibly
~$20K/year estimated operational cost savings per line (est.)
Sliding Door and Operation Mechanism Structure
This technology revolutionizes sliding door operation by centralizing opening force, eliminating off-center stress. It enables significantly smoother, ligh…
Sliding Doors: Centralized Operation Cuts Force by ~66%, Doubles Durability
~$350K/year estimated direct cost savings per facility (est.)
Lifting Device and Underfloor Storage Unit Using a Lifting Device
This technology introduces an innovative cam-driven lifting device that achieves both a low-profile design and high lifting capacity within a compact footp…
1.5× Efficiency, 20% Space Savings with Cam-Driven Lifting
~$200K/year estimated cost savings per facility (est.)
Method for Preventing Tile Falls from Buildings and Structures
This technology introduces a novel method to prevent exterior tile falls from buildings and infrastructure by creating a networked safety system. Utilizing…
Exterior Tile Fall Risk Eliminated, ~50% Renovation Cost Reduction
~$1.0M/year estimated maintenance cost reduction per facility (est.)
Foot-Operated Internal Deadbolt Lock
This technology introduces a foot-operated internal door lock, eliminating the need for hand contact. Designed for easy installation into existing deadbolt…
Foot-Operated Locks Cut Contact Risk by 90%, Boost Hygiene
~$50K/year estimated in cleaning/disinfection cost savings and increased customer satisfaction per f…
Method for Preventing Tile Detachment from Buildings and Structures
This technology offers an innovative method to prevent exterior tile detachment from existing buildings. It reinforces tile joints with a specialized wire …
Extend Building Lifespan by 30 Years, Cut Repair Costs by ~20%
~$150K/year estimated maintenance cost reduction per facility (est.)
Composite Material and Method for Manufacturing Composite Material
This technology precisely embeds particles, including large ones, within composite materials using a sheet-based molten metal solidification process. It si…
Double Durability, 30% Faster Grinding with Precision Composite Materials
~$1M/year estimated manufacturing cost reduction and performance improvement per facility (est.)
Tsunami, Missile Blast, and Other Disaster Evacuation Shelter Installed Inside Buildings
This technology provides non-invasive, heavy-duty indoor shelters for rapid disaster evacuation. Designed for quick deployment in any building type, from r…
3-Minute Disaster Shelter: Boosts Survival by >90% in Any Building
~$350K/year estimated initial investment and renovation cost reduction (est.)
Length Adjustment Fixture and Method
This technology provides a simple, robust fixture for adjusting the length of telescoping tubes. By using a single screw for secure, protrusion-free fixati…
Pipe Length Adjustment: ~65% Faster, Secure & Simple Fixation
~$150K/year estimated operational cost savings per facility (est.)
Vehicle-Mounted or Pedestal-Installed Tsunami Shelter
This technology offers mobile or fixed-base tsunami shelters designed for rapid, decentralized evacuation. Its unique non-sealed structure ensures air supp…
Mobile Tsunami Shelters: 5-Minute Deployment, Boost Survival Rates by up to 30%
~$1M/year estimated disaster preparedness cost reduction per facility (est.)
Circulating Water Roof Snow Melting System
This technology efficiently melts roof snow using a hydrophobic coating to channel snow to insulated gutters, where minimal warmed, recirculated water melt…
Cut Roof Snow Removal Costs by ~70%, Rapid Deployment for Existing Buildings
~$6.5K/year estimated operational cost savings per facility (AI est.)
Radionuclide Administration Facility Unit
This portable medical unit enables rapid, flexible deployment of alpha-ray radionuclide administration facilities. Integrating a radiation-controlled area …
Alpha-Ray Therapy: Deploy 80% Faster, Cut Costs by ~$1.5M
~$1.5M/year estimated capital investment cost reduction per facility (est.)
Security Card Recognition System
This technology integrates a unique physical card with a traditional key system, creating a purely mechanical security solution. It eliminates vulnerabilit…
100% Picking Resistance: Physical Key Security Redefined
~$100K/year estimated security-related cost reduction per facility (AI est.)
Security 3D Recognition System
This technology integrates a locking device with a unique 3D solid recognition system. It verifies the solid's distinct shape upon insertion, only then ena…
3D Recognition System: Slash Unauthorized Entry Risk by 90% for Critical Assets
~$100K/year estimated security cost reduction per facility (est.)
Tsunami Evacuation Shelter Integrated with and Serving as a Levee Structure
This technology integrates tsunami evacuation shelters directly into existing levee structures, providing robust protection and rapid evacuation for coasta…
Integrated Levee Shelters: Cut Construction Costs by ~60%, Evacuation Time by 5 Minutes
~$800K/year estimated infrastructure investment reduction per facility (est.)